Laserfiche WebLink
~V1S <br />CONSULTING ENGINEERS <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />1-800-888-2923 <br />Fax: 612-644-9446 <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />PLANNING <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: <br />HVAC <br />POWER DISTRIBUTION <br />SCADA <br />SYSTEM CONTROLS <br />OFFICES IN: <br />• MINNEAPOLIS <br />PRIOR LAKE <br />ST. PAUL <br />WASECA <br />ITEM 6.1a. <br />July 12, 1995 <br />File: 230-246-20 <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br />RE: ELK HILLS DRIVE/DODGE AVENUE <br />Dear Council Members: <br />As you requested, we have completed the plans for Elk Hills Drive/Dodge Avenue <br />intersection. The plans were designed in accordance with the Council's direction as a four <br />way intersection. Three of the legs are proposed to be a stop condition with the fourth <br />from 169 being free access. <br />It will still be necessary to work with Gary Santwire on the two properties to the south <br />which require easement acquisition. This can be done concurrently with the bidding <br />process, so that both are ready to proceed immediately after Labor day. For the Council's <br />consideration, I have attached a draft resolution which authorizes the advertisement for <br />bids. <br />If you have any questions regarding these plans and specifications, Iwill be in attendance <br />at the Monday evening meeting. <br />Sincerely, <br />MSA, CONSULTING ENGINEERS <br />~~ <br />~ ~~~i,~a <br />Terry J. Maurer, P.E. <br />TJM:pd <br />Attachment <br />aa6-izi2.~ui <br />