My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.13. SR 06-19-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-19-1995
>
5.13. SR 06-19-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2009 2:20:29 PM
Creation date
11/30/2009 2:20:29 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/19/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 2, 1995 <br />1326 Energy Park Drive File: 230-256-20 <br />St. Paul, MN 55108 <br />612644-4389 <br />1-eoo-eaa-2923 Mr. Pat Klaers <br /> City Administrator <br />Fan: b12-644-9446 <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br />RE: WASTEWATER TREATMENT PLANT BUILDING REPAINTING <br />Dear Mr. Klaers: <br />We have been working with the wastewater treatment facility operator to improve the <br />awLENCINEERwc exterior coatings on the buildings at the treatment facility. The coatings were applied to <br />ENYIRONMENiAL three buildings during the 1978 plant expansion and, over the years, the coatings have <br />MUNICIPAL deteriorated to a point that is threatening the integrity of the masonry structures. In order <br />PIA"NINC to protect the structures from further deterioration, it is necessary to clean and recoat <br />•LIU WASiE surfaces in the near future. <br />STRlK7URAL <br />suevenNC We sent out "request for quotations" to six painfing contractors, and have received three <br />1RAEEIC quotes as of the deadline, May 31, 1995. Their quotes are summarized as follows. <br />iRANSPORiAiION <br /> Price without Price with <br />ELECTRICAUMECHANICAL Stais <br />Staim~n <br />OiC <br />00 <br />1 tH <br /> <br />ENGINEERING > <br />g <br />1 <br />. <br />HVAC <br />PowEROISrRlsunoN Rainbow, Inc. $12,210 $19,610 <br />SCADA Universal Applicators, Inc. $27,231 $31,764 <br />srsrEM coNTROts Paragon Contractors, Inc. $40,700 $48,100 <br /> Note : *Color staining will be applied if necessary, depending on the results <br /> of sandblasting. <br />Rainbow, Inc., is the low bidder. We have had some previous experience with this <br />contractor on a water tower refurbishing project. The work they performed was <br />satisfactory. Based on our experience and the quotes received, we recommend the City <br />award the project to Rainbow, Inc., at the next Council meeting. The specifications require <br />OFFICES IN: completion of the work within 90 days following the notice-to-proceed. <br />MINNEAPOLIS <br />•RIOR LAKE <br />ST. PAUL <br />WASECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.