Laserfiche WebLink
Elk River ---~ <br />Municipal Utilitie s <br />Memorandum <br />To: Elk River Utilities Commission <br />Jelin Diets <br /> <br />~~~ <br />From: David Berg <br />Reviewed By: Terry Maurer <br />Date: 11/5/2009 <br />Subject: Wellhead Protection Maintenance <br />A meeting with MDH and MRWA officials is set for November 10, 2009. We will be <br />updating our Wellhead Protection Plan. Wells 7, 8, and 9 must be added to the plan and <br />conservation acts will be documented for State verification. The Wellhead Plan sets a <br />radius of the wells and this is required to be sure that we are knowledgeable of private <br />wells in the protection zone. We are then required to inspect the private wells annually <br />for proper aquifer protection. An engineering firm will be needed to run diagnostics for <br />each well zone that is to be added to our plan (7, 8, & 9). Barr was our engineering <br />consultant for our initial Wellhead Protection Plan and they will complete our additions <br />to ensure consistency. <br />