Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2010 ~~,~u 2x14 <br />Project # ~I~I.,25 <br />Project Name Plo~SoZ~ds Pump replacement <br />Type Equipment <br />Useftri Life U~aassignecl <br />Category Equipment <br />Description <br />Replace Blowsolids pump in storage ta~~k <br />Departme~~t Sewer Department <br />Co~itact Cl~ief Wastewater operator <br />Priority nla <br />Justification <br />Tl1e bio-solids pump used to pu~np sludge from the storage tanks to be sent to Land application was placed into set~vice <br />in 1994, It will be approximately 20 years old in 2013 and ready for replacement. <br />Expenditures 2010 201 2012 2013 201 Total <br />Equipment 60,000 60,000 <br />Total <br />6a,aaa <br />fi0,oD0 <br />Tunding Sou~•ces 2010 2011 2012 2013 2014 Total <br />Sewer i/und 60,000 60,000 <br />Total <br />oo,ooo <br />so,aao <br />Page S2 <br />