My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4.D. SR 11-09-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
11-09-2009
>
5.4.D. SR 11-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2009 12:05:01 PM
Creation date
11/6/2009 12:00:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk Igiver,lVlinnesota <br />2010 tl2f°u 2014 <br />Project # '~'„ 2~ <br />Project Name Rio solids disposal study <br />Type Study Departmeaat Sewer Depa~•tment <br />Useful Life Unassigned Contact Engineer <br />Category Unassigned Priority nla <br />Descxlption <br />Study to analyze sludge ~Blo Solids Dandling at the wwTP as the sewage flow grows and the quantity of sludge <br />increases. <br />Justification <br />The pity wwTP currently spreads sewage sludge annually on approxin~ately 150 acres of City owzaed property, As <br />sewage flow grows snore storage will be needed at the wWTP to store sludge between spreadings, This study will <br />look at other alter~~ative methods to handle sludge in the future freeing up the i 50 acres for other uses, <br />Expenditures 2010 2011 2012 201 2014 Totai <br />Engineering 25,000 25,000.. <br />Total 25,OQ0 <br />li`unding ~aurces 2010 2011 2012 2013 2014 Tatai <br />Sewer Fund 25,000 25,000 <br />Total 25,QO~ <br />~5,aoa <br />z~,ooo <br />Page 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.