My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4.D. SR 11-09-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
11-09-2009
>
5.4.D. SR 11-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2009 12:05:01 PM
Creation date
11/6/2009 12:00:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk ~Ziver,lVlinnesota <br />2~1a th~~u 20.4 <br />Project # ST~1Z <br />Project Name SYgua~iza~ion of 193rd Avenue Evans S~ree1 <br />Type I11fi•astructtll'e Departme~~t ~1f1'astl'~iCh11'e I~np1'ovements <br />Usefi~l Life 2d years Co~ltact Engineer <br />Category Street Cansh'ltctian Priority nla <br />Description <br />h~stall a signal system including EVP at tl~e intersection of 193rd Avenue and Evans Street. Because of tl~e proximity <br />to TH169, the signal system must be interconnected with the existing highway signal system, <br />J~ustif~cation <br />The construction of 193rd Avenue (2009} street improvement opens 193rd to CSAH 13 allowing another route to and <br />from TH169. ~~~ anticipation of the increased traffic flow tlae intersection of 193rd Avenue and Evans Street was <br />constructed to accept a signal system, <br />Expenditures 2010 2011 2012 2013 2014 Totai <br />PlanninglDesign 25a,aa0 25a,aaa <br />Total <br />250,aao z5a,aaa <br />Funding Sources 2010 2011 201.2 2013 2014 TotaX <br />Municipal State Aid z5a,ooa z~o,oaa <br />Total <br />z~a,ooa z~o,ooa <br />Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.