Laserfiche WebLink
Capital Improvement Plan <br />pity of Elk YZiver, Minnesota <br />Z~14 thr^u 214 <br />Pa•a,jcct # W~-25 <br />Pro~cct Na"'~ ~ia~Sollcls Pump replacement <br />Typo Equipment llcparhncnt Sewer Department <br />iJsefnl Z,ifc Unassigned Contact Chief Wastewater Operator <br />Catc~ary Equipment Priority nla <br />Replace Bio-solids pump in storage tank <br />The bio-solids pump used to pump sludge from the storage tanks to be sent to land application was placed rota service <br />in 1994, ~t will be approximately 20 years old in 2Q ~ 3 and ready far replacement, <br />Expenditures 2010 2011 2012 2013 2014 Total <br />Equipment sa,aaa 50,aa0 <br />Total <br />sa,aaa <br />60,aa0 <br />Eundin~ Sources 2a1a 2011 2012 2013 2014 Total <br />Sewer Fund ~o,aaa 6a,aaa <br />Total <br />6a,aaa <br />~a,aaa <br />Page 9 <br />