Laserfiche WebLink
(3) wind access easements <br />The enactment of this section does not constitute the granting of an <br />easement by the city. The owner /operator shall be responsible for acquiring <br />any covenants, easements, or siT�ilar documentation to assure sufficient wind <br />to operate the Wind Turbine. <br />(4) Abandoned towers <br />If the Wind Turbine has not operated for a period of 6 successive months, or <br />fails to meet the conditions of this ordinance, the City Council may order it <br />dismantled and the site restored to its original condition. <br />(i) Utility connection <br />�1 Utility Notification <br />No Wind Turbine shall be installed until evidence has been given that the <br />utility company has been infort-ned. <br />(2) Interconnection <br />The Mind Turbine, if interconnected to a utility system, shall facet the <br />requirements for interconnection and operation as set forth by the utility. <br />Section 3, That this ordinance shall tame effect upon publication as provided b y law. <br />Passed and adopted by the City Councd of the City of Ells River this I9t1, day of <br />October, 2009. <br />S tephaf'' e Klinzing, Mayor <br />ATTEST: <br />Tina Allard, City Clerk <br />C: \Documents and Settings \tallard\ .local SettingsWemporary Internet Fi1es \0LKF \Wind Turbines.doc <br />