My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 09-09
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2000 - 2009
>
2009
>
ORD 09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2013 1:26:14 PM
Creation date
11/3/2009 8:24:43 AM
Metadata
Fields
Template:
City Government
type
ORD
date
10/19/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />CITY OF ELK RIVER <br />i .,. <br />A , <br />The City Council of the City of lk River does hereby ordain as follows, 0 <br />Section 1. Section 30--1 titled, Definitions, of the City of Elk River Code of ordinances <br />shall be amended to add the following: <br />Wind Turbine. Means a machine that converts the kinetic energy in the wind into a usable <br />form. <br />Section 2. Section 30 -804 of the City of Elk River Code of ordinances, titled Wind <br />Turbines shall be added to include the following: <br />(a) Locations <br />Mind Turbines may be permitted where identified as a conditional or accessory use herein <br />(b) Required. Approvals; exemptions <br />Required. No Wind Turbine or support structure of any bind shall be erected anywhere <br />within the city without first 1- naldng application for and obtaining- from the City approvals <br />� y a pp <br />required by the Code. wind turbines less than 22 feet in height of attached to and no more <br />than 10 feet above an existing structure shall be exempt frorn the provisions of this Section. <br />(c) Manufacturer's documentation and engineer's certification <br />Prior to the issuance of a building permit) the applicant shall provide to the city <br />documentation or other evidence from the dealer or nian.ufacturer that the Mind Turbine <br />has been successfully operated in atmospheric conditions and is warranted against any <br />systems failures under reasonably expected severe weather operating conditions as <br />established by the Department of Building Safety. The applicant shall also provide to the <br />city documentation that the tower structure for the system has received a professional <br />engineer's certification, <br />(d) Design <br />�1 } Nois e <br />All Mind Turbines shall comply with the state pollution control agency's <br />noise pollution control section (NPC 1 and NPC 2), as amended. <br />(2) ]FCC regulations <br />All Mind "Turbines shall comply with all applicable Federal Communications <br />Commission regulations, as arnended. <br />CADocumeilts and S aiti pAtallarc \Local Settii�I;ATemporary Internet r,iles\0LKF\Wind Turbines.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.