3.02 Firm Transfor~na~ion Service . <br />As the load and system conditions change for Connexus energy, at its option and with <br />approval by the City, Connexus Energy may convert this interconnection from. backup <br />emergency transformation service normally open} to 6 Mw arm transformation service <br />normally closed}. In the event this action is taken, the annual costs of the EMRU owned <br />facilities will be based on peak demands at the waco substation, and shall be the ratio of the <br />Connexus Energy peal{ demand and City peak demand times the annual cost see example}. The <br />cost ratio for Connexus shall be limited by the 6 Mw firm load limit divided by the 28 Mw <br />substation capacity. Monthly peals demands of the City and Connexus Energy cannot be less than <br />the previous months peak. Monthly demands shall be the one~hour coincident demands at the <br />time of the substation peak unless both parties agree to another method <br />Examples of Monthly Charges: <br />Month 1 City <br />Connexus demand <br />Sub demand <br />Month 2 City <br />Connexus demand <br />Sub demand <br />Month 3 City <br />Connexus demand <br />Sub demand <br />Month 4 City <br />Connexus demand <br />Sub demand <br />= 3,000 K'~V Connexus Energy pays 1l l ~: <br />2,000 Kw 2 000 Kw ~ Annual Cost <br />+ 5,000 Kw 3,000 + 2,000 <br />= 3,500 Kw Connexus Energy pays 1112: <br />-1,800 Kw __ .2,000 Kw ~ Annual Cast <br />+ 5,300 Kw 3,500 + 2,000 <br />2,700 Kw Connexus Energy pays 1112; <br />= 2,14D Kw 2,1 DD KW ~ Annual Cost <br />+ 4,800 Kw 3,500 + 2,100 <br />3,400 Kw Connexus Energy pays 1112; <br />=1,800 Kw _ 2,100,_K ~ Annual Cost <br />+ 5,2DD Kw 3,500 + 2,1 D0 <br />Month 5 City acquires SOD Kw <br />load <br />Fram Connexus Energy. Readjust <br />maximum demands as follows <br />City = 4,000 Kw <br />Cannexus =1,600 Kw <br />5,600 Kw <br />Connexus Energy pays 1112; <br />1600 Kw ~ Annual Cost <br />4,000 + 1,600 <br />Month 6 City acquires additional 1,000 K.w Connexus Energy exercises its <br />Load from Connexus Energy, option to convert substation <br />City = 5,600 Kw to Normally open interconnectian <br />Connexus = D Kw and monthly charge defaults to <br />5 <br />