My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 10-19-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
10-19-2009
>
5.3. SR 10-19-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2009 3:33:12 PM
Creation date
10/16/2009 10:15:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(a) Monthly and Annual Waste Disposal Volume. <br /> <br />(b) Schedule of construction activities for the forthcoming year. <br /> <br />(c) Type, Quantity and Source of Material to be Disposed. <br /> <br />(d) Remaining permitted capacity <br /> <br />(e) Updated contour map which indicates the elevations of all fill areas <br /> <br />(f) Assessment of the Financial Assurances Plan. <br /> <br />(g) Evaluation of the Water Monitoring System and a proposal for <br /> continued sampling and analysis. <br /> <br />(h) Detailed evaluation of all water quality results by means of tables <br /> and graphs. <br /> <br />(i) A groundwater contour map based on the previous years’ <br /> groundwater level data. <br /> <br />(17) “Industrial Solid Waste Management Plan for Demolition Debris”, January <br />2004 <br />[WMI5] <br /> <br /> <br />(18)Submittal for January 2000 License Renewal, revised June 2001, <br />subject to the following conditions: <br />[WMI6] <br /> <br /> (a) Leachate head shall not exceed a maximum of 12 inches for any <br />liner. The Landfill shall monitor leachate head levels weekly and <br />submit results to the City quarterly. <br /> <br />(b) The sampling and contingency action protocols for liner leaks shall <br />be as outlined in the Phase IV Water Quality Monitoring Work <br />Plan, revision #3 dated February 2003. <br /> <br />(c) The Construction Quality Assurance Program shall be amended to <br />document compliance with MNDOT 3877.2B standards for <br />sampling and testing of topsoil. <br /> <br />(d) Operation of the Active Gas Venting System shall be managed to <br />mitigate landfill gas migration and ongoing ground water <br />contamination from the unlined portion of the Landfill. <br /> <br />Any changes made to the above described plans, reports, MPCA Solid Waste <br />Permit No. 74 and the County License shall also be reviewed and approved, <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.