My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 10-13-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
10-13-2009
>
5.1. PCSR 10-13-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2009 4:12:50 PM
Creation date
10/13/2009 4:11:11 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Casc File: CU 0)-19 <br />Page 3 <br />GRF. CUP <br />City of lilk River <br />The alternative fuels would be delivered in covered trailers, off loaded and stored in the existing <br />RDF building. The fuel will then be added to the RDF. A similar number of trucks or fewer would <br />deliver the fuel to the RDF building. This request will have little or no perceivable changes to the <br />operation. <br />Applicable Regulations <br />Standards for Issuance of a Conditional/ Interim Use Permit (Section 30-654) <br />The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: <br />mill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate <br />~ncini~~ or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the <br />~y <br />2. lYlill be consistent with the comprehensive plan. <br />3. lYlill not impede the normal and orderly development and improvement of surrounding vacant property. <br />4. I•Ylill be served adequately ly and will not adversely affect essential public facilities and services including <br />streets, police and fire protection, drainage, refuse disposal, water and sewer ystems, parks and schools; and <br />will not, in particzalar, create tra~c congestion or interference with traffic on adjacent and neighboring public <br />thoroughfares. <br />5. Dill not involve uses, activities, processes, materials, equipment and conditions of operation that will be <br />detrimental to any persons or property because of excessive tra~c, noise, smoke, fumes, glare, odors, dust or <br />vibrations. <br />6. lYlill not resarlt in the destruction, loss or damage of a natural, scenic or historic feature of major importance. <br />7. lYlill fully comply with all other requirements of this Code, including any applicable requirements and <br />standards for the issuance of a license orpermit to establish and operate the proposed use in the city. <br />If denial of such a permit should occur, it shall accompany recommendations or determinations by <br />findings or a report stating how the proposed use does not comply with the standards set forth in <br />Section 30-654. <br />In the review of the standards for CUP as outlined, it appears that the operation is consistent with <br />all of these standards. <br />Analysis <br />The proposed changes to GRE's license and CUP support continuing the operation at this site as <br />GRE has demonstrated that they can meet all the standards for a CUP. <br />S:APLANNING MAIN\Casc F'ilcs\CUP\CU 0)-19 GRF.AStaff mport to PC.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.