Laserfiche WebLink
The City shall be notified by the Permittee of any violations of the <br />conditions of the Permit, Air Emission Facility Permit No. 14100003-003 <br />(and applicable amendments) and NPDES Permit No. MN001988, <br />consistent with the reporting requirements for each individual permit. The <br />Permittee shall notify the City within 24 hours of discovery the release or <br />spill of hazardous materials which could endanger human health or the <br />environment. <br />9. This Permit authorizes burning at the Facility of up to 1,050 tons per day <br />of RDF using a 12-month rolling average. <br />10. This Permit authorizes burning fire derived fuel. at a rate not to exceed 200 <br />tons per da i~ any 24-hour period. and 100 tons per day on a 30-day <br />rollin J average <br />l his Permit authorizes bui-nin~ wood and wood waste excluding treated or <br />painted wood, if approval is granted from the Minnesota Pollution Control <br />Agency (MPCA). Burning of treated or painted wood shall not be allowed. <br />unless and until approval is received. from the MPCA and the perniittee <br />has completed such testing as the City shall require. <br />182. All RDF and Ash-hauling truck traffic must enter the Facility site directly <br />from Highway 10, Highway 169, or Great River Energy Drive; and must <br />exit the Facility directly onto Highway 169, unless otherwise approved or <br />directed by the Environmental Administrator or his/her designees. All ash <br />or other haul trucks leaving the Facility shall be securely covered so that <br />no ash, or other particulate matter may escape. <br />13~. Final plans and specifications for the Facility must be reviewed and <br />approve by City staff and/or consultants prior to the issuance of a building <br />permit for the Facility. <br />12-4. No RDF or Ash trucks may be washed at the Facility unless prior approval <br />is given by the City. <br />1~5. RDF receiving and handling areas in the Facility shall be fully enclosed to <br />control odor and noise and sprinkled. The doors to the RDF receiving <br />building shall remain closed at all times, except when trucks are entering <br />or leaving, and RDF shall be moved from the receiving building to the <br />burners as quickly as possible to control odors. If, in the judgment of City <br />staff, odors migrating off the facility site continue to be unacceptable, staff <br />may direct Permittee to deodorize. City staff may also direct Permittee to <br />take such steps as may be necessary to control noise emanating from the <br />Facility, including placement of mufflers on exhaust vents and stacks. <br />146. The Facility shall not undertake burning of RDFor alternative fuels unless <br />all necessary permits are in place. <br />