My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 10-13-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
10-13-2009
>
6.1. ERMUSR 10-13-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2009 3:48:31 PM
Creation date
10/13/2009 3:47:53 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ,~,_, <br />Municipal Utilities <br />Memorandum <br />To: Elk River Utilities Commission <br /> Jahn Dietz <br /> Jerry C~wnl>h~' <br /> X3'11 <br />Prepared By: David Berg <br />Check By: Terry Maurer <br />Date: 10/7/2009 <br />Subject: Hydrant Recall Efforts <br />We were informed of a Waterous Hydrant part recall in September. Hydrants <br />manufactured from 1999 to 2004 have recalled parts because of the grease within <br />the equipment. ERMU has an estimated 400 hydrants in the water system, which <br />is about 40% of our hydrant inventory. We have been in contact with Waterous <br />and they are sending us new parts for 50 hydrants at this time and more as we <br />need them. Three hydrant part exchanges an hour is the likely time consumption <br />for labor. We will be refunded $40.00 per hydrant. If this does not meet our <br />needs of time & effort, Waterous has offered a contractor option. The contractor <br />would complete the labor and we would not receive the $40.00 refund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.