Laserfiche WebLink
Capital Improvement Plan 2010 thru 2014 <br />City of Elk River, Minnesota <br />Project # ST-12 <br />Project Name Signalization of 193rd Avenue & Evans Street <br />Type Infrastructure Department Infrastructure Improvements <br />I;seful Life 20 years Contact Engineer <br />Category Street Construction Priority n/a <br />Description <br />~ ~- <br />_ rte,.. ~ ...~.. y ~. <br />Y r <br />Yi~~ <br />Mall a signal system including EVP at the intersection of 193rd Avenue and Evans Street. Because of the proximity <br />TH169, the signal system must be interconnected with the existing highway signal system. <br />Justification <br />construction of 193rd Avenue (2009) street improvement opens 193rd to CSAH 13 allowing another route to and <br />~ TH169. In anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was <br />tructed to accept a signal system. <br />Expenditures 2010 2011 2012 2013 2014 Total <br />Planning/Design 250,000 250,000 <br />Total 250,000 250,000 <br />Funding Sources 2010 2011 2012 2013 2014 Total <br />Municipal State Aid 250,000 250,000 <br />Total 250,000 250,000 <br />