My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 10-12-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
10-12-2009
>
5.2. SR 10-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2009 10:52:40 AM
Creation date
10/9/2009 10:51:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2010 thru 2014 <br />eject # OV-OS <br />eject Name Main Street Mill and Overlay <br />Type Improvement Department Infrastructure Improvements <br />Useful Life 25 years Contact Engineer <br />Category Street Construction Priority n/a <br />~~ ~~ __ <br />ifi ~~ ~y^~ r`~ I <br />Description <br />---__--_ ------------------- <br />Mill Main Street from Lowell Ave to Bridge; remove millings, resurface, and restripe street. <br />Justification <br />---- -- _- <br />Vlain Street was rebuilt in 1988, over the last 20 years there have been several open cuts of the street and numerous <br />cracks have developed. Given the amount of traffic Main Street carries (5,200-7,500 vehicles a day in 2007) its time to <br />°esurface the road. <br />Expenditures 2010 2011 2012 2013 2014 Total <br />ConstructionlMaintenance 500,000 500,000 <br />Total <br />Funding Sources 500,000 <br />2010 2011 500,000 <br />2012 2013 2014 Total <br />Special Assessments <br />Street Improvement Reserve 100,000 <br />400,000 100,000 <br />400,000 <br />Total 500,000 500,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.