Laserfiche WebLink
(10) Noise <br /> <br />(11) <br /> <br />(12) <br /> <br />(13) <br /> <br />(14) <br /> <br />(15) <br /> <br />(16) <br /> <br />Noise levels from this operation shall adhere to State noise level <br />standards at all times. Necessary measures to comply with <br />these standards will be determined by staff <br /> <br />Hours of Operation <br /> <br />All activities shall normally be conducted between the hours <br />of 7:00 a.m. and 7:00 p.m., Monday through Saturday. On <br />occasion, increased hours may be allowed for specialized jobs as <br />approved by the City Building and Zoning Administrator, <br />however, if these hours create problems for adjacent property <br />owners, staff may require adjustments to the operation. If <br />problems still persist, review of this permit will be triggered <br />back to the Planning Commission and City Council. <br /> <br />Lighting <br /> <br />Lighting from the operation shall be directed away from public <br />right-of-way and nearby or adjacent residential property. Glare, <br />whether directed or reflected as different from general <br />illumination, shall not be visible from beyond the limits of the <br />immediate site. All sources of artificial lights shall be so fixed, <br />directed, designed, or sized, that the minimum subtotal of their <br />illumination shall not increase the level of the illumination on <br />any nearby residential property for more than. 1 foot candles in <br />or within 25 feet of a dwelling or more than .5 foot candles on <br />any part of the property. <br /> <br />The piling, storing, or keeping of old machinery, junk, debris, or <br />abandoned motor vehicles, shall be prohibited on the site. The <br />storage of 250 units of specialty blocks shall be allowed on the <br />property. <br /> <br />Signage for the operation shall be allowed as per the I-2 zone as <br />a separate parcel. <br /> <br />The operation shall not interfere with future reclamation or <br />other restrictions placed on this site according to the existing <br />mineral excavation license on the property or the City's <br />Environmental Impact Statement on mineral excavation. <br /> <br />The operators shall be solely responsible for any adverse <br />environmental affects due to the operation. <br /> <br />s:Xb&zXstever\marshcup.doc Page 4 <br /> <br /> <br />