Laserfiche WebLink
bo <br /> <br />An application for a building permit, and <br />A report prepared by a qualified and licensed professional <br />engineer indicating the structure or tower's suitability to <br />accept the antenna, and the proposed method of af£Lxing <br />antenna to the structure. Complete details of all £Lxtures <br />and couplings, and the precise point of attachment shall <br />be indicated. <br /> <br />O. Abandoned or unused Portions of Towers <br /> <br />Abandoned or unused towers or portions of towers and accompanying <br />accessory facilities shall be removed as follows: <br /> <br />All abandoned or unused towers and associated facilities shall be <br />removed within 12 months of the cessation of operations at the site <br />unless a time extension is approved by the City Council. In the event <br />that tower is not removed within 12 months of the cessation of <br />operations at the site, the tower and associated facihties may be <br />removed by the City and the costs of removal assessed against the <br />property. <br /> <br />Unused portions of towers above a manufactured connection shall be <br />removed within 6 months of the time of antenna relocation. The <br />replacement of portions of a tower previously removed requires the <br />issuance of a new conditional use permit. <br /> <br />Section 3. That this Ordinance shall take effect and be in full force from <br />and after the date of its publication. <br /> <br />Passed and adopted by the City Council of the City of Elk River this /~ ~ay <br />of ,~,r/~ , 1997. <br /> <br />/d~enr~/t~. Duitsr~a'~, M'ayor <br /> <br />ATTEST: <br /> <br />'Sandra A. Thackeray, City Clerk <br /> <br /> <br />