Laserfiche WebLink
in order to reduce the number of towers needed to serve the <br />community. <br /> <br />C. Uses <br /> <br />The Antenna Tower Overlay District (AT) is an overlay zoning district; land <br />zoned into the AT will also maintain its original zoning classification. All <br />permitted, accessory, and conditional uses allowed in the underlying zoning <br />district will continued to be allowed on land rezoned to AT, subject to all <br />restrictions and requirements applicable in the underlying district. In <br />addition to the uses allowed in the underlying district, the following uses <br />shall be allowed as a conditional use in the AT: <br /> <br />Antenna arrays, including radio, television, commercial wireless <br />telecommunication, and microwave transmitting and receiving <br />equipment, supporting towers, buildings and enclosures accessory to <br />the tower and antennas. <br /> <br />D. Co-Location Requirements <br /> <br />All commercial wireless telecommunication towers erected, constructed, or <br />located within the City shall comply with the following requirements: <br /> <br />A proposal for a new commercial wireless communication service tower <br />shall not be approved unless the City finds that the <br />telecommunications equipment planned for the proposed tower cannot <br />be accommodated on an existing or approved tower, building or other <br />structure within a one mile search radius (one half mile search radius <br />for towers under 120 feet in height, one quarter mile search radius for <br />towers under 80 feet in height) of the proposed tower due to one or <br />more of the following reasons: <br /> <br />The planned equipment would exceed the structural <br />capacity of the existing or approved tower, building or <br />structure, as documented by a qualified and licensed <br />professional engineer, and the existing or approved tower <br />or structure cannot be modified, reinforced or replaced to <br />accommodate planned or equivalent equipment at a <br />reasonable cost. <br /> <br />bo <br /> <br />The planned equipment would cause interference <br />materially impacting the usability of other existing or <br />planned equipment at the tower, building or structure as <br />documented by a qualified and licensed professional <br /> <br /> <br />