My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. PCSR 09-15-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
09-15-2009
>
5.4. PCSR 09-15-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2009 12:03:18 PM
Creation date
9/14/2009 12:03:09 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(h) Utility connection. <br />(1) Utility= Notification: No Wind Turbine shall be installed until evidence has been <br />given that the utility company has been informed of the customers intent to install an <br />interconnected customer owned generator. <br />(2) Interconnection: The Wind Turbine, if interconnected to a utility system, shall <br />meet the requirements for interconnection and operation as set forth by the utility. <br />Section 3. That this ordinance shall take effect upon publication as provided by <br />law. <br />Passed and adopted by the City Council of the City of Elk River this day of <br />20_ <br />Stephanie Klinzing, Mayor <br />ATTEST: <br />Tina Allard, City Clerk <br />s:\document\ordinance\oa97-l.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.