My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 09-15-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
09-15-2009
>
5.2. PCSR 09-15-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2009 2:34:20 PM
Creation date
9/11/2009 2:34:19 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of <br />fiver <br />MEMORANDUM <br />TO: Jeremy Barnhart, Planning Manager <br />FROM: Terry Maurer, Public Works Director ~' <br />DATE: September 10, 2009 <br />SUBJECT: Elk River Station 53-Unit Apartment Building <br />File #226-196P <br />As requested, I have reviewed the drawings submitted for the proposed Elk River Station <br />53-unit apartment building to be located in the northeast quadrant of Twin Lakes Road and <br />172°d Avenue NW. The submittal contains a site plan, grading and storm sewer plan, <br />landscaping plan, and utility plan. At this point in time, there is not a significant amount of <br />detail shown on the plans; however, it appears from a site civil standpoint this proposal is <br />very similar to the Depot at Elk River Station proposal that worked its way through the city <br />in the early part of 2008. My suggestion would be that the site civil requirements be <br />essentially the same for this new proposal as was approved for the previous proposal. To <br />that end, I have attached a copy of my March 10, 2008 comments from the detailed plans <br />submittal for the Depot at Elk River Station. It appears that many of these <br />recommendations from the earlier proposal have already been incorporated into the current <br />proposal. Once detailed plans are submitted, we will be looking for concurrence with all of <br />the major issues identified for the site civil concerns of the original Depot at Elk River <br />Station proposal. <br />If you have any questions regarding this information, please contact me. <br />S:APLANNING MAIN\Case Files\CUP\CU U9-20 Depot EK Station-DuffyAengrs comments.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.