Laserfiche WebLink
:`_ top t:~ ~xt <br />1. <br /> <br />2. State and local <br />incentives <br />Highway accessibility <br />3. Availability of skilled <br /> labor <br />4. Energy availability and <br /> costs <br />5. Tax exemptions <br />b. OccupancT and <br /> Construction Costs <br />?. Corporate Tax Rate <br />~, .Proximity to major <br />actors <br />9. Available land <br />10. Labor costs <br />11. Expedited or "fast-track" <br />permitting <br />12. Available Buildings <br />13. Accessibility to major <br />airport <br />14. Availability of advanced <br />IT services <br />15. Proximity to supplier (tie) <br />Low union profile (Tie) <br />