Laserfiche WebLink
Memo to Planning Commission <br />Page 3 <br />September 24, 1996 <br /> <br />area showing the expanded coverage that would result in the placement of the <br />proposed antenna. <br /> <br />Recommendation <br /> <br />It is recommended that the Planning Commission recommend approval of the <br />rezoning request to Antenna Tower Overlay District based on the following: <br /> <br />1. The rezoning would not adversely affect the property under consideration. <br /> <br />2. The rezoning would be compatible with surrounding land uses. <br /> <br />o <br /> <br />The applicant has shown that the proposed rezoning to AT is necessary in <br />order to provided effective cellular phone coverage for this area. <br /> <br />Conditional Use Permit <br /> <br />Performance standards <br /> <br />The application was compared to the following performance standards found in <br />Section 900.12.19 (Antenna Tower Overlay District): <br /> <br />The apphcant has provided a letter from the manufacturer of the pole, <br />Valmont Industries Inc., which gets into the structural and engineering <br />details of the pole and why there is no danger of the pole collapsing on to <br />adjacent property. This letter is included for your review. <br /> <br />o <br /> <br />There is only one tower proposed for this lot and the lot exceeds the one <br />acre minimum lot size requirement. <br /> <br />The height of the tower, 199 feet, does not exceed the 240 foot maximum <br />height allowed in the zoning code. Because of the proposed height of the <br />tower does not exceed 200 feet, the apphcant is not required to file with <br />the F.A.A. for authorization. However, the apphcant has indicated that <br />they will supply a report prior to receiving a building permit. <br /> <br />No portion of the pole, supports or related equipment extends across any <br />right-of-way, property line, public street or sidewalk; the pole and the <br />equipment building comply with the setback requirements. <br /> <br />The applicant has indicated that the pole will be designed to exceed the <br />the wind loading factor prescribed in the Uniform Building Code. <br /> <br /> <br />