My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 10-21-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
10/21/1996
>
4.2. SR 10-21-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:29 AM
Creation date
5/6/2003 1:59:12 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/21/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular meeting of the Elk River Utilities Commission <br />September 11, 1996 <br />Page 2 <br /> <br />Mr. Zabee moved to direct MSA to analyze the Water Tower <br />sites, and to consider an additional site outside the urban <br />territory. Mr. Dietz seconded the motion. Motion <br />carried 3-0. <br /> <br />5.2 UD-date, R.W. Beck electric rate study <br /> <br />Mr. Adams discussed the progress of the rate study with <br />the Commission, indicating the biggest challenge will be <br />determining future capital costs. <br /> <br />5.3 Up-date Elk River Utilities Office Buildinq <br /> <br />Mr. Adams advised the Commission that bids will be Opened <br />September 16, 1996 for the re-roofing project. The <br />present roof has been temporarily patched by Skyline <br />Roofing, who installed the rubber membrane in 1993. <br /> <br />5.4 Resolution for Public Power Week (Oct. 2-13,1996) <br /> <br />The Commission was up-dated on plans for the recognition of <br />Public Power Week. The Mayor will be proclaiming the week, <br />we will have newspaper coverage, and the Current will <br />devote part of its October publication to the Utilities. <br /> <br />5.5 Street Liqht Construction standards <br /> <br />Mr. Adams recommended offering three choices to customers, <br />as follows: <br /> <br />Standard 35' wood pole with 6' galvanized steel mast <br />and a 100 or 250 watt HPS cobra head lamp. Used in <br />existing areas with overhead line construction and <br />existing areas with underground construction with no <br />street lights. Installation Cost @ $700.00 each. <br /> <br />30' direct buried fiberglass pole with 6' aluminum mast <br />and a 250 watt HPS cobra head lamp. Used in new <br />developments with underground electrical system at <br />intersections of major roads. Installation cost <br />@ $1,200.00 each. <br /> <br />Ce <br /> <br />23' direct buried fiberglass pole with 6' aluminum mast <br />and a 150 watt HPS traditionaire lamp. Used in new <br />developments with underground electrical systems of <br />minor street intersections and mid-block lighting if <br />desired. Installation cost @ $900.00 each. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.