My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 07-14-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
07-14-2009
>
4.2. ERMUSR 07-14-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 2:14:06 PM
Creation date
7/13/2009 2:13:21 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At the June 9~' Commission meeting, staff brought the need to purchase an electrical distribution <br />pad mounted dead-front switch that had not been budgeted for. The Commission approved the <br />expense up to $25,000 with the contingency that staff brings back a plan on where the switch <br />would be funded. The switch quote came back higher than anticipated at $28,800 (refer to <br />attached quotes) and therefore has not been ordered. This switch would become the spare if the <br />2 switches currently in inventory are used for the Simonet and Xenia projects. Because the bids <br />contracted work for these two projects came in very low (refer to agenda items 5.1 and 5.2), it is <br />proposed that the $28,800 cost for this switch be split between the two projects capital budgeted <br />amount. <br />