My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 09-16-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
09/16/1996
>
6.5. SR 09-16-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:28 AM
Creation date
5/1/2003 8:19:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-i~-i~96 11:17 P.O~ <br /> <br />1326 I~n,rg~, l~atJ~ Drbe <br /> <br />Sr. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-64~,94~6 <br /> <br />September 13, 1996 <br />File: 230-000-11 <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parl~way <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: RIVER OF LIFE ADMINISTRATIVE SUBDIVISION <br /> <br />Dear Mr. Ach: <br /> <br />(]VIL ENGINEERING: <br />ENVI~ON~',ENTAL <br />MUNICIPAL <br />~LANNING <br /> <br />~LID WASTE <br />.STRUCTURAL <br />SUEVEYING <br /> <br />TRafFIC <br />~ANS~TATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING: <br /> <br />~VAC <br /> <br />POWER C)LSTRIBLJTION <br /> <br />SCADA <br /> <br />SYSTE~ CONTROLS <br /> <br />OFFICES IN: <br /> <br />~AINNEAPOLI$ <br /> <br />PRIOR L~KE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />As requested, we have reviewed the proposed administrative subdivision entitled River <br />of Life. Based on our review and comments received at the staff review meeting, we <br />would offer the following comments: <br /> <br />1. There should be no access from Lot 1 onto CSAH No. 1. <br /> <br />This administrative subdivision creates three lots that will access onto 217th <br />Avenue. That road is currently approximately 20 l~eet wide and is a gravel road. <br />It appears that the road is located along the section line. We believe that the <br />administrative subdivision does not accurately reflect the right-of-way that <br />currently exists there. Phil Hals indicated at the staff review meeting that his <br />research from several years ago indicated that there is on]y 33 feet of right-of-way <br />total. We would assume that this is also centered on the section line with 16a,~ <br />feet located north and 161/2 feet located south of the section line. We would <br />recommend that the administrative subdivision be revised to accurately reflect the <br />right-of-way that currently exists and dedicate enough additional right-of-way <br />along 217th Avenue for a total of 60 feet. <br /> <br />o <br /> <br />When development occurs on Lot 1, Block 1, we would recommend that 217th <br />Avenue be upgraded to a bituminous surface, standard width roadway from CSAH <br />No. 1 to the most easterly access to Lot 1, Block 1. <br /> <br />The plat dedicates a 60-foot right-of-way north-south along the Concord Street <br />alignment. It is not recommended that the roadway be required to be constructed <br />at this time. The two lots that have frontage certainly do not support the <br />construction of approximately a quarter mile of roadway. Also, the construction <br />of Concord Street from the south to the north would have the potential of putting <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.