My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. SR 06-29-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
06-29-2009 SP JT
>
2. SR 06-29-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2009 1:55:59 PM
Creation date
6/26/2009 1:48:17 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Power quality, reliability, and response time are excellent. These are one of the reasons why <br />the Data Centers are here. These are also reason why ERMU can attract larger <br />commercial/industrial customers even through that rate class is not the lowest available. <br />(Refer to attached reliability graphs). Response time to fires and <br />6. The electric utility provides 31 good jobs within City. <br />7. Metering Department technical support for Water Department metering needs. <br />8. There are 4500 water meters and 9000 electric meters that are read every month and we <br />contract this service out. 2009 budgeted numbers for meter reading are $80,000, of which <br />$60,000 is attributable to the electric department. <br />9. The Utilities makes bond payments on 25% of City Hall building. The remaining bond <br />payments are $1,842,705 on the utility portion. This would be an issue only if the Utilities <br />were to be sold. <br />10. Lake Orono water level is monitored and controlled by ERMU <br />11. Underground facility locating for water system done with electric locating. There are <br />approximately 2000 locates required for the water system per year. <br />12. Local control designing and setting rates to meet local (needs not rural coop needs). <br />13. Ability to culture City economic development through rate design. <br />14. Availability of emergency general transfer of funds from ERMU to City. <br />15. ERMU's Conservation Improvement Program (CIP) offers more programs to the ratepayers <br />than the neighboring utilities offer. CIP money stays in ERMU service territory. See <br />attached CIP comparison sheet. <br />16. Local economy stimulated through utility money spent at local shops for trucks, boots, <br />clothes, fuel, printing, etc... <br />Disadvantages of a Municipal Electric Utility <br />1. Political accountability <br />2. Legal liability <br />3. Accounting and audit accountability <br />4. Bond/debt liability <br />5. Opportunity cost of revenue from sale during time of reduced State funding <br />This memo and discussion at the June 29 j oint Council/Commssion meeting is intended as an <br />opportunity to provide information. Because of new developments in the discussions with Connexus <br />and the delay in getting relevant information pertaining to Connexus' involvement in any of the <br />scenarios outlined in this memo, no action is requested from the Council or Commission at this time. It <br />is possible that Connexus would not be able to provide GRE board approved numbers prior to the BSII <br />July 15th LOI deadline. However, Connexus has indicated that preliminary numbers would be available <br />as soon as July 6th. Also, results from a BSII construction cost analysis should be available by the end <br />of June. Having this additional information may help in making a decision. The recommendation of <br />staff is to table this topic to be able to include this additional information for a future discussion prior to <br />the BSII LOI July 15th deadline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.