My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. & 3.2. PCSR 06-23-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
06-23-2009 SPEC
>
3.1. & 3.2. PCSR 06-23-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 8:35:09 AM
Creation date
6/19/2009 1:50:42 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Supplemental Data on HKGi report <br />16 June 2009 <br />Page 3 <br />scenarios. Our assumptions are for development in the project area to be absorbed over a 10 to 25 year period at <br />an annual absorption rate of 4%. This results in approximately 35, 000 to 90, 000 square feet of space per year <br />from approximately 2030 to 2055. <br />We did not address "indirect jobs "for either scenario due to the wide range of assumptions that might inform <br />such an estimate. We recognize that while the landfill is operating there will be positive indirect economic <br />impacts. When the landfill closes, those economic impacts will be greatly reduced. Development in place of the <br />landfill expansion will continue to deliver positive indirect economic impacts well into the future. The landfill <br />operations and gravel mining operations have a finite life. Once the resource is gone or capacity is used, those <br />operations are closed and or reclaimed and indirect jobs related to gravel mining and landfill operations are <br />gone. <br />Projections and assumptions are speculative by their nature. <br />Our projections are based on best available data and our firm's extensive experience in land use planning <br />and community development. Due to the long term nature of this request and potential development, long <br />term projections are necessary to fully understand the magnitude of this decision which will have short <br />term benef is and long term consequences. <br />We have prepared two graphs that best illustrate the potential fiscal impacts of the proposed landfill <br />expansion showing the short term benefits and the longer term lost opportunity that development would <br />bring to the area over time. These graphs represent potential property tax impacts and job growth impacts <br />and are included in the attached slides. <br />The land use fiscal impact and job growth analysis is only one part of what must inform a good decision on <br />this expansion request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.