My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. & 5.4. PCSR 06-09-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
06-09-2009
>
5.3. & 5.4. PCSR 06-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 2:19:42 PM
Creation date
6/8/2009 3:58:40 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/9/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Application Type Fee Escrow Total <br />Land Use Amendment $420 NA $420 <br />Zone Change $400 NA $400 <br />Conditional Use Permit $520 $1,000 $1,520 <br />Grand Total $2,340 <br />2.2.5 PROJECT NARRATIVE <br />See Section 1.2 and 3.1 of this application. <br />2.2.6 LEGAL DESCRIPTION/SURVEY OF SUBJECT PROPERTY TO BE AMENDED <br />See Exhibit 7. <br />2.2.7 ALL OTHER INFORMATION AS DETERMINED BY STAFF <br />The applicant met with the Planning Manager and Environmental Administrator on February 20, <br />2009 to discuss the City's submittal requirements. No additional information was requested in <br />regards to the Zone Change Application. <br />2.3 CONDITIONAL USE PERMIT REQUIREMENTS <br />• The Elk River Code, Chapter 30. Land Development Regulations, Article VI. Zoning, Division 2. <br />Administration and Enforcement, Subdivision III. Conditional Use Permits, governs the conditional <br />use permit application requirements: <br />Sec. 30-651. Application. <br />(b) An application for a conditional use permit shall be fi/ed with the director of planning on a <br />form prescribed by the city. The application shall be accompanied by such plans and information <br />as maybe required by the city, including, without limitation: <br />(I) A site plan drawn at scale showing all abutting /ots, existing buildings, existing uses, <br />utilities, curb cuts, and locations of trees ha ving a diameter of six inches or more. <br />(2) A proposed development plan showing proposed ingress and egress to the property <br />and proposed structures, yards, off-street parking and loading areas, and, where <br />appropriate, plans for utilities, screening, buffering, landscape, lighting, signs and open <br />space, and a deve%pment schedule. <br />In addition to the information required by Code the Conditional Use Permit application form <br />requires the submission of the following information: <br />^ Land Use Application Form <br />^ Application Fee <br />• <br />Elk River Landfill SDA w ~ gonestroo ~iWenCl< Section 2-3 <br />Land Use Application .,F„~„~,~,,,« <br />
The URL can be used to link to this page
Your browser does not support the video tag.