The site currently generates electricity from the methane gas extracted during the waste • <br />degradation process. With the development of the SDA, the facility intends to add a second on- <br />site electrical generation plant. The methane extraction system is developed with the landfill, and <br />will continue operation after the landfill is final covered. The landfill gas extraction wells are <br />constructed in accordance with industry standards. <br />Depending on the selected end use plans for the site, modification of some of the gas extraction <br />wells may be necessary, to locate the wellhead below grade. The modification will still allow <br />access to the monitoring well for maintenance and monitoring, but will allow the well-head to be <br />secured for the intended end-use. <br />The SDA will be constructed in a series of phased construction projects. The timing of the <br />projects will be dictated by incoming waste volumes and site operations. The following Table 1 <br />indicates that anticipated SDA construction schedule based on current and anticipated waste <br />volumes. <br />Table 1. SDA Construction Phasing <br />Cell Number Approximate <br />Year of Construction Approximate <br />Acres Constructed <br />18 2011 7.5 <br />19 2013 7.5 <br />20 2015 7.5 <br />21 2017 7.7 <br />22 2020 7.9 <br />23 2022 8.1 <br />24 2025 8.4 <br />25A 2027 9.0 <br />25B 2030 9.8 <br />The Site Development Plan indicates the location of each of the phases of landfill development. <br />Based on the above information and current waste flows, it appears that the final phase of the <br />SDA will be constructed and closed during the time period from 2030-2033. <br />1.2.6 GRADING AND DRAINAGE PLAN <br />The ERL has made it their priority to handle and control all stormwater generated on the SDA on- <br />site. The grading and drainage plans are provided on the Subwatershed Map and Drainage Plan. <br />The drainage calculations are presented in Exhibit 4. <br />During the initial construction phases of the SDA, stormwater generated will be piped to an <br />interim pond located south of the active cells. As construction and mining conditions dictate, <br />permanent sedimentation basins will be constructed and put into service for treatment of runoff <br />from the SDA. The sedimentation ponds will control and minimize the amount of sediment-laden <br />runoff that leaves the SDA. If the designated area for the permanent ponds is not available, an <br />equivalent sized temporary pond will be constructed in the mined area. Perimeter ditches of <br />equivalent capacity to those shown on the final closure plans will route stormwater to the <br />temporary ponds. <br />• <br /> <br />Elk River Landfill SDA ~ Section 1-6 <br />Land Use Application «F^,~~~ ... , ~ Bonestroo ~WenCl< <br />