My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. SR 08-26-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
08/26/1996
>
7.0. SR 08-26-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:27 AM
Creation date
5/1/2003 7:14:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/26/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED PROPOSAL BY SUB-COMMITTEE <br /> <br />EXPENSES: <br />SALARIES: The salary amount we adjusted for 1995-96 season due to the late November 15th s-tart down to $65,1300 <br /> from the Feasibility Study and increased it by $2,000 to $76,000 for the 1996-97 season. <br /> The present Arena Manager sala~ is $30,250, part time Ice crew is about $11,500 and concession <br /> workers are about $5700 for the past 1994-95 season for a total ~lary of $47450. For 1995-96 the budget figure of <br /> $65,000 is a good number for the two finks would only be open for 6 months. The 1996-97 increase to $76,000 <br /> would increase both Ice crew and conce.~ions workers as well as increase the Arena Manager's Salary. At present <br /> we have one full time Arena Manager and one half time employee during the skating .~.ason and other part time <br /> Ice Crew (5-6) and Concession (5-6) workers. , <br /> <br />BENEFITS: The benefits we felt were high but if the City ! EDA takes over Operations of the Arenas this would be the <br /> same as the rest of the city employees. At present the Arena Manager receives a $1000 IRA annually and paid <br /> medical Blue Cross Blue Shield insurance coverage $1700. The Arena Manager also receives mileage at a/'ate of <br /> · $.25 cents per mile which came'to about $450 in 1993-94. <br /> <br />REPAIRS Fiscal year ending 1994 & 1995 shows the actual Repairs and Maintenance cost at about $14,500. <br />& MTCE. We thought the $39,000 was on the high side but left it as is for the full 1996-97 season. We'did reduce it <br /> for the partial season of 1995-96. We feel some of the expenses could be reduced by using city stattwhen needed <br /> for special projects; And to be able to use city owned equipment instead'of renting il. <br />UTILITIES: The utilities we felt were very high. The total for 1993-94 was $33,500.and the Actual + Budget for <br /> 1994-95 season is at about $33,000. The biggest expense for the utility group is the Electric at about $23,500 <br /> 1993-94 and $24,500 for' 1994-95. Gas at $7000, Telephone at $1800 and sanitation at $1,I00. The new building <br /> will be bigger and a larger ice sheet but with newer technology should be more efficient also. The Elk River <br /> Municipal Utilities Commission has given this project an Economic Development Rate for a 5 year tenn. The <br /> estimate for tripling the electric usage with the special rate would put the cost at about $63,600 for the 1995-96 <br /> seasom Doubling these other expense the total would 1~ about $82,000. $o we. feel a conservative estimate of <br /> $90,000 is justified. See Attached. <br /> <br />INSURANCE: There is a new Insurance Company, Cartier Insurance Agency Duluth, MN that strictly insures Ice <br /> Arenas and the estimate we received from them Was $20,000. 1993-94 insurance totaled $13,000 which includes <br /> Property $2560, Liability $3400 + Open Skate $155 + Rollerblading $250+Dance & Circus 5130, Employee <br /> Dishonesty $1 i0, Crime $150, Boiler $1600, Worker Compensation $3200, Accident & Medical $900. <br /> <br />.·ZAMBONI: . ZamboniMaintenance and Fuel for 1993-94 totaled 52404. 1994-95 is est/mated at 53,200..We felt the. <br /> maintenance was a little on the high side seeing that in the 3 previous years we did'not total $7,000..But <br /> recognizing that the Zamboni is aging that an increase to $6,000 in 1996-97 should be adequate. <br /> <br />DRY FLOOR Increased to 52,000. <br />EVENTS: <br /> <br />EXISTING <br />ARENA <br />DEBT: <br /> <br />In November 1995 the debt. on the existing arena will be paid off. The balance a~ of May I, 1995 is <br />about $15,776. The debt is held by three banks, F;rst National Bank of Elk River, Bank of Elk River, <br />and State Bank of Rogers. The payment is $2,500 principle plus interest which is based on one <br />percentage above the T-Bill rate, not less than 8% and not more than 10%. The numbers are shown based <br />on an 8% rate. <br /> <br />PAYMENT <br />OF PARTIAL <br />S~S: <br /> <br />There is a request by the committee members to offset some of the Salaries by payment from <br />the City (Park fees) or Park and Recreation Board for improvements. This may only be needed for the <br />first three years or so depending on the bond structure. <br /> <br />Revision Date: 2/27/95,revfeas3,dpm <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.