My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 05-12-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
05-12-2009
>
4.2. ERMUSR 05-12-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 10:59:30 AM
Creation date
5/12/2009 10:45:38 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'3'~echnical Batletin 1alo~ 98-10 I~1 <br />duly 201e' <br />TABLE 3 <br /> <br />Delamination Risk Factor Coating Selection Sased On <br />Cohesive Stress Factors <br />5 or greater Not Recommended <br />4.5 <br />3.5 - 4 Not Recommended <br />l or 2 (From Table 2) <br />3 <br />2 1, 2, 3 or 4 (From Table 2) <br />1, 2, 3, 4 or 5 (From Table 2) <br />1 1, 2, 3, 4 or 5 (From Table 2) <br />TABLE ~ <br />Spot Primer Intermediate Topcoat Cohesive Stress <br /> <br />Series 135 Series 156 Series 30 (optional) 1 <br />Series 18 or Series 30 Series 30 Series 30 <br />Series 4 Series 23 Series 2H, 23 ~ <br />Series 135 Series 135 Series 73, 1074 or 1075 4 <br />Series 27 or N69 Series 27 or N69 Series 73, 1074 or 1075 5 <br />Note: After spot priming, the number of coats required to achieve complete coverage depends on method <br />of application and color of the intermediate and/or topcoat. Series 6, 7, 18, 30 and 156 are <br />considered "dry fait" products, but jobsite conditions must be taken into account when spraying. <br />See the appropriate PDS for additional information. <br />MB <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.