My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. EDSR 05-11-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2009
>
05-11-2009
>
6. EDSR 05-11-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2009 4:15:20 PM
Creation date
5/8/2009 4:15:15 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/11/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ~~ ~`~~~L ~~~l~ <br />'~ <br />A parwng deck or ramp may be needed in the future <br />to accommodate increased demand for the Northstar <br />commuter rail. <br /> <br />Northstar Commuter Rail Station <br />The Northstar commuter rail is seen as a plus for growth in the district, but not a <br />primary driver for change. As the system matures and ridership grows it is important <br />the station meets the demands of the patrons. Adequate parking will be a necessity. <br />While the current !ot provides 70o spaces, additional space may be needed in the <br />future. A parking deck or ramp structure should be considered for the station in <br />consideration with mixed-use development before more surface parking spaces are <br />added since little land exists for development immediately adjacent to the station. <br />Providing adequate facilities for bike commuting are also suggested. Bike lockers <br />allow a safe, secure location for commuters to store their bikes. A well integrated trail <br />system will further promote bike commuting to the Northstar station. <br />Community Circulator Bus <br />V~,~ith the potential for more increased reverse commute trains, the city of Elk River <br />should examine the feasibility of a community circulator bus to work in concert with <br />the Northstar schedule. The circulator would connect community employment <br />centers, downtown and commercia! centers to the Northstar station eliminating the <br />need for the automobile for same commuters. <br />Rail Line <br />The master plan suggests providing an additional crossing of the BNSF rail line near <br />73rd Avenue. This additional crossing will allow for improved traffic flow for the <br />commercial and industrial uses in the north of the study, rather than funneling all traffic <br />to Twin Lakes Parkway to cross the rail line. As the city lobbies to shift the rail line <br />north near downtown, the city should investigate the feasibility of either an at-grade <br />or grade separated crossing in this location. While creating an additional crossing is <br />challenging, it is still worthwhile as something to strive for to create better and more <br />intensive development. <br />The opportunity for a rail spur off of a major freight rail corridor could be significant <br />for industrial uses in the FAST. The master plan suggests a parallel spur line to serve <br />the industrial uses surrounding the RDF plant. <br />:~, <br />Go <br />'i7R3t. C~VE?rl'~12 Focused Area ~"lady =;r?-M'"` <br />Bike lockers allow n secure location <br />store their bikes <br />A circulator bus would connect other uey acuvrLy <br />centers in Elk River with the Northstar station <br />°,n additional rail crossing snouia ne consaereu u~ <br />,<<~d Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.