My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.2. SR 05-11-2009
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2009
>
05-11-2009 SP
>
2.2. SR 05-11-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2009 2:09:06 PM
Creation date
5/8/2009 2:09:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/11/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 09-13 National Repo Depot <br />Page 4 Ken Dehn/Monte Howerton <br />Building. No changes are proposed for the building. The external display area is proposed to be <br />fenced in. Due to its prominence on the site, staff suggests this fence be architectural. <br />Si a e. The applicant proposed some additional signage, including a free standing sign. All signs <br />will need to meet the sign ordinance. <br />The suggested conditions are based on the current ordinances. <br />Comprehensive Plan <br />The Highway Business land use is the most intensive form of commercial development in Elk River. <br />Businesses in this category may be the largest both in terms of size and traffic generation. Market <br />orientation tends to be regional in nature. Development orientation tends to be toward regional <br />highways. Future Highway Business developments should be located within the Urban Service <br />Boundary and adjacent to regional highways. The proposed use meets these requirements. <br />Transportation <br />There are two access points to the site, both utilizing a frontage road along Highway 10. The <br />subject property does not have direct access to Highway 10. Upon development/improvement of <br />adjacent properties, a similar easement will be suggested. Further, if and when accesses are <br />consolidated along Highway 10, these access arrangements will be very beneficial. <br />Action Motion by Second by Vote <br />Follow Up <br />S:\PLANNING MAIN\Case Files\CUP\CU 09-13 National Repo Depot\CU 09-13_PC2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.