Laserfiche WebLink
CON~ULTINGENGINEERS <br /> <br />1326 Energy Park Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-644-9446 <br /> <br />August 9, 1996 <br />File: 230-320-20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: ORONO LAKE 3RD ADDITION <br /> <br />ITEM 5.12. <br /> <br />Dear Council Members: <br /> <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />~NNING <br /> <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELECTRICAL/MECHANICAL <br />ENGINEERING; <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />As directed by the City Council at last Monday evening's public hearing regarding Orono <br />Lake 3rd Addition, we have prepared the attached resolution which authorizes the <br />preparation of plans and specifications. As you are aware, this project was City initiated; <br />therefore, this resolution requires a 4/5 City Council vote to be adopted. According to <br />the project schedule contained within the feasibility study, we would anticipate the plans <br />being done by early November, allowing time for bidding and holding the assessment <br />hearing sometime in early 1997, such that construction could begin in the Spring of 1997. <br /> <br />If you have any questions regarding this information, I will be in attendance at your <br />August 19, 1996, City Council meeting. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br />Terry J. l~ffurer, P.E. <br /> <br />TJM:tw <br />Enclosure <br /> <br />320-0904.aug <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />