Laserfiche WebLink
CONTRACT CHANGE ORDER <br />Contract: Wastewater Treatment Facility Phase II Improvements Order No. 7 <br />Owner: Citv of Elk River Date: 3/17/2009 <br />To: City of Elk River <br />You are hereby requested to comply with the following changes from the contract plans and <br />specifications: <br />Description of Changes <br />Supplemental Plans and Specifications Attached <br />DECREASE <br />in Contract Price <br />INCREASE <br />in Contract Price <br />TOTALS <br />$ 1,345.00 $ 56 435 00 <br />NET CHANGE IN CONTRACT $ <br />$ 55,090.00 <br />JUSTIFICATION: <br />Deduct for Deleted Effluent -869.00 <br />Trou h Handrail <br />Generator Pad Extension 659.00 <br />Add Exterior Lights and 3386.00 <br />Interior 4-Wa Switches <br />Di ester Lines to S litter Box 23193.00 <br />Add Stop Gate to UV Bypass 5314.00 <br />Channel <br />Install Draintile Behind 2204.00 <br />Digesters <br />Increase Conductor Size to 359.00 <br />Generator <br />Di ester Nozzle Mixer Pi in 3116.00 <br />Stainless Steel Guide Rails 9800.00 <br />Gate O erator 6884.00 <br />Electric Service to 1520.00 <br />Compressor in Trickling Filter <br />Pum Station <br />Deduct for Sidewalk Deleted -476.00 <br />at Digester Building <br />WASTEWATER TREATMENT FACILITY PHASE II IMPROVEMENTS CONTRACT CHANGE ORDER <br />226-158 SECTION 00672-1 <br />