Laserfiche WebLink
Elk River -~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />April 6, 2008 <br />TO: Elk River Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />FROM: Mark Fuchs <br />SUBJ: Electric Department Update <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />• Car hit 3-phase double dead-end angle pole on County Road 13 north of County Road 40. <br />A new pole was installed <br />• Car hit a 3-phase pole at County Road 30 and Joplin Street. The pole had a 3-phase <br />underground riser on it and a transformer feeding a single phase service. Anew pole was <br />installed and the 3-phase riser was rebuilt. <br />• Car hit an in line 3-phase pole on County Road 39. Anew pole was installed. <br />• Continued tree trimming. <br />• Continued working on changing our cutouts and fuses. <br />• Completed a quarterly count on selected inventory. <br />• Diversified inspections - we did our annual safety inspections on the boom and digger <br />trucks. <br />• The City garage should have all annual DOT inspections done on the trucks and trailers <br />by April 10th <br />• Several linepersons going to switching training in Buffalo on April 7th <br />