Laserfiche WebLink
Elk River -=~ <br />Municipal Utilities <br />13069 Orono Parkway ~ P.O. Box 430 <br />Elk River, MN 55330-0430 <br />Apri17, 2009 <br />To: Elk River Municipal Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />From: Troy Adams <br />Subj: Staff Updates -Director of Operations <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />On March 19`x', Commissioner Dietz and management met with Rod Kelsey from Riley, <br />Dettmann & Kelsey to review partial results from the job description questionnaires and the job <br />evaluation system to be applied to them. Still missing are job description questionnaires for the <br />tvvo new positions created during the Utilities recent staff restructuring. These two new positions <br />are for the Director of Operations and the Superintendent of Technical Services. The job <br />evaluation system and it application to the job description questionnaires that staff had <br />completed are really intuitive and easily used. Management is in the process of reviewing the <br />results to provide feedback to Mr. Kelsey. <br />The City of Elk River has begun work on an agreement between the Utilities and the City for the <br />sharing of the City Public Works Director for supervision of the Water Superintendent. A draft <br />of the agreement is attached for the Commission's review. No action is needed at this time. <br />Connexus Energy has resumed working on a distribution interconnection agreement with ERMU <br />for the Waco Substation. Elk River Municipal Utilities has distribution interconnection <br />agreements with Connexus for the North Substation and Substation 14 -Bank 4. At both of <br />these substations, Connexus has taken a feeder out of the sub. At the Waco Substation, <br />Connexus is requesting to take a feeder out to be used as an emergency backup. The <br />interconnection agreements have been 5 year rolling agreements covering shared costs based on <br />usage. This new agreement will be similar and was originally discussed with ERMU before the <br />Waco Substation was constructed. <br />During the second week of May there will be a number of American Public Power Association <br />(APPA) trainings offered in the Twin Cities area. Included in the selection of trainings are some <br />public power rate design classes. A number of the Utility's managers plan to attend some of the <br />trainings. The costs for these trainings are covered in the 2009 budget. <br />