My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 04-14-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
04-14-2009
>
4.1. ERMUSR 04-14-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2009 2:51:58 PM
Creation date
4/13/2009 2:51:58 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Fees <br />Fees for governmental agencies or private entities providing a public safety service shall be determined <br />by the Utilities on a case-by-case basis. All other entities requesting antenna space shall be subject to a <br />minimum monthly fee of $500 and subject to additional fees determined by the Utilities on a cases-by- <br />case basis depending on factors including but not limited to the type of equipment to be installed and <br />spatial allocations required. All users shall be responsible for electrical use and service installation <br />charges associated with any installed equipment and equipment maintenance. <br />7. Termination <br />The Utilities may terminate any lease if it determines that any one of the following conditions exist: <br />1. A potential user with a higher priority cannot find another adequate location and the potential use <br />would be incompatible with the existing use. <br />2. A user's frequency broadcast unreasonably interferes with other users of a higher priority, <br />regardless of whether or not this interference was adequately predicted in the technical analysis. <br />A user violates any of the standards in this policy or the conditions attached to the Utility's <br />permission. <br />Before taking action, the Utilities will provide notice to the user of the intended termination and the <br />reasons for it, and provide 60 days for the lessee to have an opportunity to address the Utilities regarding <br />the proposed action. This procedure need not be followed in emergency situations. <br />8. Reservation of Right <br />Notwithstanding the above, Elk River Municipal Utilities reserves the right to deny, for any reason, the use <br />of any or all Utility owned property by any one or all applicants. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.