My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. - 4.3. SR 07-29-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
07/29/1996 - SPECIAL
>
4.1. - 4.3. SR 07-29-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:25 AM
Creation date
4/30/2003 2:06:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/29/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lefebvre Companies Page 5 <br />July 23, 1996 <br /> <br />2. As mentioned above, particular attention should be given to providing additional <br /> screening of the outdoor storage area from Ulysses Street. This can be <br /> accomplished by using conifers and/or berming along with other material. <br /> <br />o <br /> <br />According to the development plans, it appears as though the areas dedicated to <br />green space will be seeded. This is acceptable, however, staff would recommend <br />along the curb edge a five foot strip of sod be provided to immediately stabilize <br />the area and prevent erosion around the curb. <br /> <br />Underground irrigation will also be required in all front yard landscaped areas. <br /> <br />Trash Enclosure <br /> <br />The proposed trash enclosure is a 10 x 10 fenced area. Staff has discussed this <br />enclosure with Lefebvre Companies and have recommended that the trash <br />enclosure be large enough to meet the company's needs. This would include an <br />enclosure large enough to store all of their miscellaneous equipment and debris as <br />well as recyclables. <br /> <br />Consideration should also be given to relocating the enclosure to the rear of the <br />facility and constructing the walls with more of a durable (concrete) material. <br /> <br />· Building Elevations <br /> <br />The proposed building is proposed to be a pre-cast concrete building with a <br />combination ofprefinished metal panels around the office and above the overhead <br />doors. It is anticipated the pre-cast panels will be random rib, smooth concrete <br />finish and is not anticipated to be painted at this time. <br /> <br />It is recommended the Planning Commission recommend approval of the following: <br /> <br />mo <br /> <br />Rezoning of approximately 3 acres from I-1 (light industrial) to PUD (planned <br />unit development) based on the following findings: <br /> <br />The rezoning and development of the land is consistent with the land use <br />found in the Comprehensive Plan. <br /> <br />The proposed development is consistent with existing uses and will <br />provide for the construction of Ulysses Street to 171 st improving <br />emergency accessibility to a developed industrial park. <br /> <br />o <br /> <br />The rezoning is consistent with the City's Economic Development strategy <br />to promote business retention within the community. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.