Laserfiche WebLink
b) Proposed relocated underground electric lines to clear the MNDOT <br />construction area (highlighted in red). <br />c) Proposed underground electric lines that needs to be constructed to <br />support development of this area (highlighted in blue). <br />As of the date of this writing, we have the detailed plans of Highway 101 and CSAH 39 <br />but are still awaiting the CSAH 42 plans. The marked up aerial plan is a concept plan. <br />The proposed electric lines under b and c above would be underground and at the back <br />side of your easement. <br />It is our intent to relocate the electric lines this year so we are clear for your 2006 <br />construction. The proposed underground electric lines under c above (blue line) would <br />occur in the 2006-2007 timeframe including directional boring under the Mississippi <br />River. <br />In order for us to complete our planning and get the necessary materials ordered, please <br />respond with your comments by May 25, 2005. We would be glad to meet with you <br />about these plans. Upon your concurrence, we would apply for the necessary paralleling <br />and crossing easements. <br />~_- <br />Best r ards, <br />~1 ,, <br />Bryn Adams, P.E. <br />General Manager <br />cc: File <br />Glenn <br />