My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. ERMUSR 03-08-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
03-08-2005
>
6.4. ERMUSR 03-08-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2009 10:44:34 AM
Creation date
4/7/2009 10:44:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/8/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br />West & North Substation <br />Project Scope <br />Client: Elk River Municipal USG Activity Number: <br />USG Project Manager: Jon Wadsworth <br />Client Contact Name: Bryan Adams Project Title: West 8 North Substation <br />Transformer Upgrade <br />Client Project Site: West 8~ North Substation Site <br />Re nested Date: Completion Date: <br />Description of Scope and/or Related Information: <br />The existing 12/17.9 MVA LTC 691N/12.47KV transformer at the Elk River West Substation shall be removed and a <br />new 15/28 MVA LTC 69 kV/12.47 kV transformer will be installed at the Elk River West Substation. United Services Group <br />will develop specifications and review the West Substation equipment components and relaying components to ensure <br />adequate capacity, functionality, and physical clearances. Drawings will be changed or created as required. Elk River <br />Municipal Utilities shall make arrangements for transformer testing, loading relay settings, and testing of the circuit breaker. <br />The existing 12/17.9 MVA LTC 69KV/12.471N transformer from Elk River West Substation will be relocated to Elk <br />River North Substation. A 69 kV SF6 circuit breaker will be installed at the Elk River North Substation. United Services <br />Group will develop specifications and review the North Substation equipment components to ensure adequate capacity, <br />functionality, and physical clearances. Drawings will be changed or created as required. Modifications to the existing <br />foundations, cable conduit, grounding and steel drawings are required. United Services Group will provide physical <br />installation design package for the installation of the transformer and circuit breaker. A Relay and Control package will be <br />designed for the control of the circuit breaker. A control panel shalt be required. Ado power supply (battery bank) shall be <br />required to power the relay control panel and circuit breaker. Elk River Municipal Utilities shall make arrangements for <br />transformer testing, loading relay settings, and testing of the circuit breaker. <br />United Services Group will provide engineering design drawings, specifications of electrical equipment, and a <br />bidders list for material purchase and installation; Elk River Municipal Utilities will provide coordination for the delivery and <br />staging of all materials, coordination of bid processes, coordination of construction and project management for the <br />completion of the substation. United Services Group shall assist Elk River Municipal Utilities in the permitting of the <br />construction and inspection of the substation for energization and turnover. <br />Construction Permit Re uiq red? Y/N Y Estimated En ineerin Cost: $21,875.00 <br />Estimated Construction Cost: N/A Total Estimated Cost: N/A <br />Construction Start Date: N/A End Date: NIA Engineering Completion 10/1/05 <br /> Date: <br />Additional Information. <br />SCADA shall be provided by others. A separate project scope will define the SCADA requirements. <br />Client Project Date: <br />Manager: <br />
The URL can be used to link to this page
Your browser does not support the video tag.