My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6. ERMUSR 01-11-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2005
>
01-11-2005
>
6.6. ERMUSR 01-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2009 3:37:35 PM
Creation date
4/6/2009 3:37:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPX 2020 <br />INTERIM REPORT <br />DECEMBER 2004 <br />TABLE OF CONTENTS PAGE <br />IDENTIFYING MINNESOTA'S ELECTRIC TRANSMISSION INFRASTRUCTURE 3 <br />NEEDS: AN INTERIM REPORT <br />Future needs 3 <br />Our current system 4 <br />A changed market 4 <br />The CapX 2020 planning effort 5 <br />Preliminary results 6 <br />Next steps 6 <br />CapX 2020 Vision Team members ~ <br />ATTACHMENT A: FORECASTED NEED g <br />ATTACHMENT B: OVERVIEW OF CURRENT TRANSMISSION SYSTEM 10 <br />Current network I 0 <br />Recent trends I 1 <br />Current utility planning process 11 <br />Current regulatory structure 12 <br />ATTACHMENT C: OVERVIEW OF MARKET CHANCES 14 <br />ATTACHMENT D: CAPX 2020 PLANNING EFFORT 16 <br />Red River Valley Study 16 <br />Vision Study 16 <br />A. Base model development 1 ~ <br />ATTACHMENT E: STATE PLANNING AND REGULATORY ISSUES 19 <br />Industry structure 19 <br />Cost recovery 19 <br />Need certification 20 <br />Planning 21 <br />Timing 21 <br />Regional issues 21 <br />Jurisdictional issues 21 <br />ATTACHMENT F: PRELIMINARY RESULTS 23 <br />Study analysis 2~ <br />Initial results 28 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.