Laserfiche WebLink
9 <br />-~,•,. <br />ilk ~Ziver` ~ ~ .~ <br />ur~ici~~.l ~ti~ities <br />13069 Orono Psrl<way <br />Elk River, I~l'~I 57 3 ~0 <br />September 25, 2006 <br />To: f3i11 1\Iaetz, Director Parl: & Recreation <br />Parks & Recreation Commission <br />From: Bryan Adams, General Manager <br />Blk River Munici al Utilities ~'~ ~~ <br />p <br />Subject: Camp Cozy Park <br />fix: 763.4 4L~099 <br />As you are aware, another large data center will be constructed in Elk River. This data <br />center will substantially increase Elk River's tas base, provide jobs, and will encourage <br />development of future businesses in Elk River. This data center will be located just north <br />of the existing Target data center alone Waco St. in the Elk Path Business Center <br />development. This data center requires large quantities of electrical power and energy. <br />A new electric substation will be constructed on Co Rd 35 as it crosses the rail road (see <br />attached aerial view). Large underground electric feeders will be constructed From this <br />new substation to the new data center location. <br />The attached aerial view also reflects a proposed route of the new electrical feeders. This <br />route is on the eastern boundary of Camp Cozy Park. There could ultimately be as many <br />as 4 electrical feeders all within a 1 ~' strip between the future Waco substation and Elk <br />Path Business Center to support the current and future development. <br />We are proposing to install these feeders underground using either directional boring or <br />plowing to minimizing surface disturbance. Minimal tree disturbance is anticipated. A <br />small construction trail for equipment will need to be installed. Construction is <br />anticipated to tale place in mid 2007 time frame. The cost of this new substation and <br />electrical feeder work to serve this new data center is in the $2,00,000 range. <br />We ask authorization to proceed with this project, utilizing Camp Cozy Park as a route. <br />~Ue will work closely with your staff in locating an acceptable route and working through <br />any construction issues that may arise. <br />