My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. ERMUSR 03-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
03-14-2006
>
6.3. ERMUSR 03-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2009 2:12:09 PM
Creation date
3/31/2009 2:12:08 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overall Rating: Very Good <br />Comments: <br />This past year we have worked on: <br />1. >~lood Borne Pathogen Manual <br />2. Blood Borne Pathogen Exposure Packet <br />3. Lockout /Tag out Manual <br />4. Natural Gas Visiting speaker-Terry Crooker Center Point Energy <br />5. MN OSHA mock inspection has been completed at the Plant and Shop <br />6. Accident Investigation was emphasized <br />7. CDL Presentation from MN DOT (Dick Norberg) <br />8. Sexual Harassment Awareness & Prevention Training-League of MN Cities <br />9. An update was distributed on Crisis procedures and dealing with the Media. <br />First, the support and participation from the Utility has been very good. The Utility <br />Departments have been tremendous to work with. This past year has been good for your <br />Utility. As a management staff you were able to visit Shakopee Utilities and hopefully <br />exchanges of ideas will follow. <br />Please continue to require Contractors to follow the OSHA standards as a minimum. <br />Contractor Safety is always a concern. Remember to include Safety as a topic in all Pre- <br />Construction meeting and in Staff meetings. <br />The growth of the community is creating more and more pressure on your Departments. <br />The Electric Department has been and continues to be very Pro active. You have had a <br />very good managerial staff with Glenn and Dave. You have added a tremendous asset in <br />Theresa as Office Manager and the reassignment of Dolores to a HR role will be great. <br />On the addition of Theresa, she has picked up various duties that are required for her <br />position such as the Substance Abuse program, CDL rules and OSHA 300 reporting as <br />fast or faster than anyone I have worked with. <br />Spill Containment information was given in May-Are your programs complete? ---- <br />Required to be prepared by and signed off by a PE. <br />This comment is a question I am asking all locations I travel to: <br />This is a question I want you to pose to yourself. <br />It is a concern that I have noticed in my years of visiting many different locations. <br />Have you as the manager recently walked through your various Departments without a <br />specific reason? "Just to see how things are going! ! ! ! !" <br />To often the busy schedule that you have becomes so overwhelming so that you do not <br />have time to check on your "MVR" (most valuable resource-your staff) <br />This doesn't apply to everyone but if it does----See if you can make an attempt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.