Laserfiche WebLink
Page 3 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />February 14, 2006 <br />50% more load than the Target Data Center. The cable installation to support the demand of <br />the new data center would start late summer 2006. The proposed Waco Substation with two <br />feeders will be required to support this facility. An additional $3,500,000 bond will also be <br />required. Discussion followed regarding the cable installation and where it was to be buried. <br />The cable installation itself will be contracted out and our crews will do the terminating. <br />6.1 Review & Consider Pick-up Truck Purchase <br />The 2006 budget contains a line item to replace one pick-up truck. Elk River Ford has <br />the Minnesota State bid for a'/4 ton standard 4 x 4 pick-up truck. Bids were reviewed with <br />staff recommending the bid be given to Elk River Ford. The existing 1997 pick-up that is <br />being replaced will be sold this fall through sealed bids. John Dietz asked Glenn Sundeen if <br />he would call Phil Hals from the Street Department and have the 1997 pick-up truck inspected <br />to see if it was feasible for the City to use it. <br />Motion by James Tralle to purchase a'/4 ton standard 4 x 4 pick-up truck with electric <br />windows from Elk River Ford. John Dietz seconded the motion. Motion carried 3-0. <br />Other Business <br />John Dietz said he received a call from a customer regarding the possibility of the City and <br />Utilities buying an infi-ared camera that would be available for customers to inspect their <br />homes to see if there are major heat loss problems. These cameras cost between $10,000 and <br />$12,000, or cameras can be rented for approximately $700 per week. Discussion followed as <br />to the benefit of having a camera and who would be doing the inspection service. Jerry Takle <br />said there are consultants that perform this type of service. Currently USG performs line loss <br />checks for the Utilities. This will be tabled and revisited at a later date. <br />John Dietz has received all the performance reviews for the General Manager and would like <br />to call a special meeting after the next Commission meeting pursuant to Minnesota Statutes <br />13D.05 Sub3. <br />The next regularly scheduled meeting of the Elk River Municipal Utilities Commission <br />will be Tuesday, March 14, 2006. <br />President Jerry Takle adjourned the regular meeting of the Elk River Municipal Utilities <br />Commission at 5:00 p.m. <br />ectfully s fitted, <br />Judy McSpadden <br />Recording Clerk <br />