Laserfiche WebLink
~j <br />Elk River <br />Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />March 10, 2006 <br />To: Elk River Municipal Utilities Commission <br />Jerry Takle <br />John Dietz <br />Jim Tralle <br />From: Bryan Adams <br />Subject: Miscellaneous Issues <br />~ ~ <br />phone: 763.441.2020 <br />Fax: 763.941.8099 <br />Enclosed is the packet for the Tuesday, March 14, 2006 commission meeting at 4:OOpm. <br />On February 15, 2006 Pat Hemza plead guilty to 6 counts of theft by swindle in exchange <br />for full restitution of $279,138.00 plus a year in the county jail. On April 10, 2006, she <br />will make full restitution and start her jail time. <br />Ron Black has informed us that the Lucile Briggs property directly east of our power <br />plant and directly south of Main Street is for sale. Attached is a map reflecting the area. <br />The appraised value is $80,500 for the land, and $147,200 for the building for a total of <br />$227,700. Due to the close proximity to the power plant, we should be interested in this <br />parcel. Mr. Black did not know the asking price. The blue area on the map indicates <br />FEMA flood fringe and flood way. No permanent structures are allowed in this area, <br />only storage. <br />On a final note, GRE decided it would be best if they purchased the land for the proposed <br />Waco Substation. They needed a much larger piece of property than we do. We would <br />then purchase what we need from GRE. GRE is very close to closing the deal, if not <br />already. completed. <br />