My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 02-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
02-14-2006
>
5.4. ERMUSR 02-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2009 12:24:23 PM
Creation date
3/31/2009 12:24:22 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DISPERSED GENERATIONIINTERRUPTIBLE LOAD PROGRAM <br />DESCRIPTION: Beginning January 1, 2000, Elk River Municipal Utilities (ERMU) <br />provided an incentive to encourage on-site customer-owned generation. The target market <br />consisted of those commercial accounts that already owned backup generators of at least 100 <br />kW, or were considering an investment in backup generation of at least 100 kW due to the <br />critical nature of their business. Effective May 1, 2003, that program was expanded to <br />include commercial accounts of at least 100 kW that are able to interrupt at least 100 kW of <br />load. <br />AVAILABILITY: This Program is available to commercial customers served by ERMU <br />which have sufficient load to fully utilize the output of between 100 kW and 1000 kW of on- <br />site generation capacity or that can interrupt between 100 kW and 1000 kW of load. <br />Customers with on-site generation in excess of 1000 kW or with in excess of 1000 kW of <br />interruptible load may also qualify for this Program, but special terms and conditions may <br />apply. Program participants must agree to operate their on-site generator, or limit operations <br />to interrupt all or a mutually agreed upon portion of their electric load upon notification by <br />ERMU or its designated agent. This Program applies to qualifying customers subject to the <br />following Conditions of Service: <br />1. The Customer must be operating between the hours of 4 PM and 9 PM and have <br />between 100 kW and 1000 kW of electric load that can be either switched to a <br />standby generator or interrupted upon notification by ERMU or its designated <br />agent. <br />2. The Customer must provide access to a phone line for notification and remote <br />meter reading. <br />3. The Customer who selects billing under this Dispersed Generation/Interruptible <br />Load Program must agree to remain on the Program for at least one year. A <br />written Agreement stating term, incentive, terms and conditions of service, and <br />safety and operating standards will be required. See either the Dispersed <br />Generation Agreement or Commercial Interruptible Load Agreement for details. <br />4. The Customer must provide an acceptable means to transfer all, or a mutually <br />agreed upon portion of the Customer load to the on-site generator upon <br />notification by ERMU. If the Customer does not have on-site generation, <br />the Customer must have a means to reduce load to a predetermined demand <br />level (PDL) within 30 minutes following notification by ERMU. <br />5. Time and duration of on-site generator operation or interruption shall be at the <br />discretion of ERMU but will not exceed 10 hours per occurrence for those with a <br />generator or 6 hours per occurrence for those who have interruptible load. <br />6. Operation of Customer's generation and collateral equipment or interruption of <br />load must not cause any reduction in the quality of service provided by ERMU to <br />any other customer. <br />7. It is the Customer's responsibility to supply fuel and maintain the on-site <br />generator and collateral equipment to meet the electric power requirements <br />during periods of operation. Customer will be reimbursed for fuel used in <br />excess of 80 hours run time at a rate of $.08/kilowatt-hour produced by the <br />generator. There is no fuel reimbursement for those Customers who do not <br />have on-site generation. <br />8. Notification of intent to .operate Customer's on-site generator by ERMU will <br />be made to give at least thirty minutes notice. In emergency situations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.