My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. ERMUSR 02-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2006
>
02-14-2006
>
5.4. ERMUSR 02-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2009 12:24:23 PM
Creation date
3/31/2009 12:24:22 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/14/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal # 0 <br />2006 Commercial & Industrial <br />Custom Energy Efficiency Grant Application <br />Elk River Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br />Environmental Assurances <br />vescribe how hazardous wastes which may result from this project will be handled: <br />Power Quality <br />Does the project meet power quality requirements: <br />Power Factor: yes / no Harmonic Distortion: yes / no <br />If "yes" in either case, Elk River Municipal Utilities needs a copy of the specification sheets on file at their office. <br />Removed Equipment <br />uescnbe how removed equipment will be made inoperable. <br />Trade Allies (contractor or supplier performing the work) <br />Name <br />Address <br />City, State, ZIP <br />Phone <br />Demand 8 Eneroy Savins~s Calculations <br />Summer Coincidental Demand Savings: kW(E) - kW(N) _ - <br />Average Demand Savings: kW(E) - kW(N) _ - <br />Average Annual Energy Savings: kWh(E) - kWh(N) _ - <br />Estimated Annual Demand Savings: <br />- kW $ - / kW x = $ - <br />Demand Rate - $/kW Months <br />- kW $ - / kW x = $ - <br />Demand Rate - $/kW Months <br />(Second line for two tier or seasonal rates) Total Demand Cost Savings $ - . <br />Estimated Annual Energy Savings: <br />- kWh/month $ - / kWh x = $ - <br />Annual kWh / 12 ergy Rate - $/kWh Months <br />- kWh/month $ - / kWh x = $ - <br />Annual kWh / 12 ergy Rate - $/kWh Months <br />(Second line for two tier or seasonal rates) Total Energy Cost Savings $ - <br />Estimated Total Savings: $ - <br />area <br />r Total Project Cost: ~-~ (Incremental Costa Standard vs. High Efficient) <br />nter Grant amount requested: $ - (Maximum 50% of project cost up to $10,000 or as <br />determined by Elk River Municipal Utilities) <br />(Benefit Cost Ratio: ~ (Must be >_ 2.00 -Increase BCR to meet all criteria) <br />grant project cost: r$ <br />mple Payback after Grant (yrs) (SPB Must > 1 yr.) <br />kW <br />kW <br />kWh <br />Page 3 of 3 Energy Savings-Grant(3) 2005 CEEG 110104 GRE <br />
The URL can be used to link to this page
Your browser does not support the video tag.