My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-2007 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2007
>
03-20-2007 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2009 3:33:42 PM
Creation date
3/23/2009 3:33:21 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
3/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />March 20, 2007 <br />David Berg said the maintenance on the last two filter plants were completed. A <br />Magmeter has been installed in Well #5 completing our changeover from mechanical to <br />electronic meters in all the Wells. Well #5 should be on-line by the end of March. <br />Theresa Slominski reported the audit was finished. Steve McDonald of Abdo Eick & <br />Meyers will do a formal presentation at the April meeting. The auditors would like to see a <br />quarterly reconciliation of inventory material versus only at year end. Discussion followed <br />regarding the wire theft that has affected the utilities this past year. James Tralle asked about <br />installing a security camera at the plant. Staff will look into this. The new payment <br />processing system is still being tested but will need a two month period to test. Theresa <br />presented a Tobacco Cessation Reimbursement form from the City of Elk River and Elk River <br />Municipal Utilities. <br />James Tralle moved to adopt the Tobacco Cessation Reimbursement form. Jerry Gumphrey <br />seconded the motion. Motion carried 3-0. <br />5.2 Review and Consider Bid Tabulation to Install UG Cable <br />On March 8, 2007, bids were received to install the two underground feeders from the <br />new Waco Substation to the United Health Group data center facility. Staff recommends <br />awarding to the lowest responsive bidder, Michels Pipeline Construction. <br />James Tralle moved to award Michels Pipeline Construction, to install the underground feeder <br />for the Waco Substation. Jerry Gumphrey seconded the motion. Motion carried 3-0. <br />5.3 Review and Consider Bid Tabulation to Furnish Station Material <br />On March 19, 2007, bids were received to furnish the substation material for the Waco <br />Substation. Staff recommends awarding to the lowest responsive bidder, L & L Substations. <br />James Tralle moved to award L & L Substations, to furnish Station material for the Waco <br />Substation. Jerry Gumphrey seconded the motion. Motion carried 3-0. <br />5.4 Review APPA Position Papers <br />Bryan Adams and Jerry Taale attended the APPA legislative rally held in Washington <br />D.C. Discussion followed regarding the issues and topics that were addressed. <br />5.5 Review Waco Substation & Electric Feeder Schedule <br />The material and installation schedule for the Waco Substation project was reviewed. As <br />to date the project is on schedule. <br />5.6 Update Electric Revenue Bond Sale <br />The 2007 bond issue was assigned a bond rating of A2, which is good. Our rate will be <br />at 4.0699% for the 2007 bond issue of $2,875,000. The closing date is set for March 28~'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.